How to Install a Turbo Kit on the RSX
نوشته شده توسط : piros365

Prepare the Engine Bay for the Turbo Install

 

Remove the strut tower brace from both sides of the engine compartment, then remove the intake manifold cover, header heat shield and the header.ECU Chip Tuning Stuff an old rag into the down pipe to prevent loss of any fittings. Remove the washer bottle and then the front bumper cover and the metal bumper support underneath.

 

Release the fuel system pressure by first removing the gas cap, then loosen the fuel pressure valve located on the fuel rail.

 

Identify the VTC solenoid using the RSX repair manual, and remove the wires leading to it. Remove the heat shield and then the solenoid, then pull away the covering of the oil pressure sensor.

 

Install the hardware included with the turbo kit for the oil pressure gauge and oil feed line, then reinstall the oil pressure sensor, the oil feed line and the pressure gauge fitting.

 

Install the Turbocharger

 

Install the head bolts supplied with the kit, then mount the header in place utilizing the original gasket,Heavy Duty Diagnostic then attach the oil feed line to the turbo.

 

Install the down pipe from the turbocharger onto the header and mount the turbo against the manifold according to the kit instructions.

 

Tighten all necessary bolts and hardware and ensure that the oil feed return line is in place.

 

Install the Intercooler

 

Install the intercooler in front of the radiator using the supplied hardware with the kit.

 

Route the intercooler intake and outlet pipes around the radiator and attach them to their respective positions on the turbo unit.

 

Install the air intake into the turbo compressor housing's inlet and secure it with the supplied brackets.

 

Install the New Fuel Injectors

 

Unbolt the fuel rail and remove the stock fuel injectors.

 

Splice the wires leading into each fuel injector,SuperOBD SKP-900 then attach these leads to the connection for each new fuel injector.

 

Place the new fuel injectors into position and then replace the fuel rail.

 

Finish the Assembly of the Engine Compartment

 

Reinstall the bumper support and bumper cover over the intercooler after cutting away the lower air dam's mesh cover to provide clearance.

 

Double check all fittings, then install the oil pressure gauge,Auto key Programmer air intake temperature sensor and boost gauge.

 

Reinstall the fluid bottle, the strut tower brace and the header heat shield.

 





:: بازدید از این مطلب : 25
|
امتیاز مطلب : 0
|
تعداد امتیازدهندگان : 0
|
مجموع امتیاز : 0
تاریخ انتشار : سه شنبه 20 تير 1396 | نظرات ()
مطالب مرتبط با این پست
لیست
می توانید دیدگاه خود را بنویسید


نام
آدرس ایمیل
وب سایت/بلاگ
:) :( ;) :D
;)) :X :? :P
:* =(( :O };-
:B /:) =DD :S
-) :-(( :-| :-))
نظر خصوصی

 کد را وارد نمایید:

آپلود عکس دلخواه: